Application example · Vietnam · 50 Hz
22 kV/0.4 kV Compact Prefabricated Substation
Most Vietnamese industrial estates are supplied at 22 kV, while production equipment runs at 0.4 kV.
- Country
- Vietnam
- System
- 22 kV/0.4 kV
- Frequency
- 50 Hz
- Package
- 9 equipment items
Project snapshot
| Country | Vietnam |
|---|---|
| Application | Industrial manufacturing plant |
| System | 22 kV/0.4 kV compact prefabricated substation |
| Voltage | 22 kV supply / 0.4 kV distribution |
| Frequency | 50 Hz |
| Design standards | IEC 62271-202 (prefabricated HV/LV substations), IEC 60076 series (transformer), IEC 62271-200 (MV switchgear), IEC 61439-1/-2 (LV assemblies), IEC 60529 (IP rating) |
Site and grid challenges
Most Vietnamese industrial estates are supplied at 22 kV, while production equipment runs at 0.4 kV. The closer the step-down point sits to the load, the better: every extra metre of LV route costs copper and adds voltage drop, which shows up most painfully when large motors start.
A compact prefabricated substation addresses this by combining MV switching, the transformer and the LV board in one factory-assembled enclosure. It can be placed in the plant yard right beside production, avoiding a purpose-built brick switchroom. Site civil work shrinks to a foundation and a cable trench.
The tougher design questions come from the climate. Humidity remains high in both the north and south for much of the year, the rainy season is long and thunderstorms are frequent. Moisture condensing on insulation inside an outdoor enclosure is a genuine failure mechanism, so ventilation design, anti-condensation heating and drainage deserve as much attention as the electrical ratings. Sites near the coast or in the Mekong and Red River deltas also face chloride exposure, which mainly affects the choice of coating system.
Heat is the remaining constraint. An enclosure retains the losses produced by the transformer, and IEC 62271-202 defines enclosure classes precisely because a transformer that is comfortable in free air may exceed its temperature-rise limit once housed. Transformer loading in an arrangement of this type is therefore assessed with the enclosure class, not from the nameplate alone.
Typical equipment package
What a project of this type usually includes, and the engineering points that decide each item.
| Equipment | Role | Engineering notes |
|---|---|---|
| Enclosure | Factory-built outdoor housing for the complete substation | Sheet steel or GRP; IP rating and corrosion class chosen for the site; IEC 62271-202 enclosure class determines allowable transformer loading |
| MV switching | Ring main unit or MV switchgear compartment for the 22 kV supply | SF6 or solid-insulated RMU, or air-insulated metal-clad panel where future extension is planned; internal arc class specified for the layout |
| Transformer | 22 kV/0.4 kV distribution transformer | Oil-immersed (S11/S13 type) or cast-resin dry-type (SCB series), selected by fire strategy and enclosure ventilation capacity |
| LV distribution | LV main board and outgoing circuits | IEC 61439-1/-2 assembly; form of separation and short-circuit rating set by plant fault level and maintenance practice |
| Protection | MV fuses or relay protection; LV incomer and feeder breakers | Discrimination across MV, transformer and LV stages so a feeder fault clears without tripping the incomer |
| Thermal management | Natural or forced ventilation, louvres with insect and rain screens, anti-condensation heaters | Airflow sized for total transformer losses at design ambient temperature |
| Earthing | Enclosure bonding, transformer neutral earthing, connection to external electrode | Conductors rated for prospective earth-fault current and clearing time; bonding does not rely on hinges or paintwork |
| Cable interface | MV entry, LV outgoing entries, trench and gland plates | Non-magnetic gland plates for single-core LV cables; entries placed so minimum bending radius is maintained |
| Monitoring | Temperature indication, door and alarm contacts, optional gateway | Modbus RTU/TCP, IEC 61850 or DNP3 where the substation must report to plant SCADA |
Stage by stage
The sequence at a glance
The contact sheet summarises the four phases typical of an installation of this kind: delivery, placement and testing, cabling and earthing, and the finished substation. Viewed together, they show why the sequence is fixed. The foundation and earth electrode must be built and tested before the enclosure arrives, because the electrode connection is normally buried and inaccessible afterwards. Cables are pulled after placement so that real route lengths can be measured. Any test that requires the enclosure to be opened is completed before the area is fenced. Because each phase constrains the next, the sequence belongs in the design stage rather than being improvised on site.

Compact prefabricated substation of the type delivered to industrial sites, shown in transit Stage 1 of 4Delivery
A compact substation travels as one complete unit, and transport is when it is most vulnerable. It is tall relative to its weight, with the heavy transformer mounted low and off-centre, so lashing must restrain lateral movement as well as vertical. On arrival the enclosure is inspected for transit damage and door and louvre alignment; with an oil-immersed transformer, oil level and gasket joints are checked for leaks. Any shock recorders are read before the delivery is accepted. Lifting uses only the designated points, with spreader beams that keep slings off the enclosure walls.

Placement on a prepared foundation and pre-energisation testing typical of this type of substation Stage 2 of 4Placement and testing
The substation is placed on its prepared concrete base and levelled. Level affects both mechanical and electrical performance: a tilted enclosure loads its base frame unevenly, strains door seals and allows water to pool on the roof, while a tilted oil-immersed transformer gives a misleading oil-level reading. After anchoring, insulation resistance is measured on MV and LV sides, ratio and vector group are confirmed, and the mechanical interlocks between switch, earthing switch and cable compartment are operated by hand. Protection settings are compared with the discrimination study. All of this is done before the trench is closed and access becomes harder.

Cable trench and earthing arrangement of the type used for a 22 kV/0.4 kV compact substation Stage 3 of 4Cabling and earthing
MV and LV cables are installed, terminated and glanded, and the earthing system is completed. Pulling tension and sidewall pressure are controlled so the conductor and insulation are not damaged at bends — the minimum bending radius applies at the gland plate as much as in the trench. MV terminations depend on a clean screen cut-back and a correctly seated stress cone, and cable screens are bonded to the enclosure earth bar through a conductor rated for earth-fault duty. The external electrode is connected and its resistance measured, and step and touch voltages are assessed where the location is accessible to the public. Gland plates are sealed to maintain the enclosure IP rating.

Illustrative complete configuration of a 22 kV/0.4 kV compact substation for an industrial plant Stage 4 of 4Complete configuration
The completed substation is fenced, labelled and secured. Fencing and clearances form part of the safety case for any outdoor MV equipment on a site shared with non-electrical staff. Before energisation the system is checked end to end: earth continuity from every enclosure part to the main earth bar, injection testing through relay, CT circuit and trip coil together, and confirmation of interlocks. Energisation is staged — the transformer is first charged with no load, then load is added progressively while temperatures, LV voltage and monitoring signals are observed. Warning signs, access control and as-built documentation complete the handover package.
What Toppower can configure
For a comparable industrial enquiry, Toppower Asia can configure voltage ratio and tapping range, transformer capacity, vector group and impedance, with copper or aluminium windings. The transformer may be oil-immersed or cast-resin dry-type, with insulation and temperature class chosen to suit the plant's fire strategy and the ventilation capacity of the enclosure. MV switching can be an SF6 or solid-insulated ring main unit, or an air-insulated metal-clad panel where later extension is expected. LV assemblies can be supplied with the required form of separation and short-circuit rating. Enclosures can be specified by IP rating, corrosion class and coating system, with forced ventilation, anti-condensation heating and lighting as options. Monitoring can include winding-temperature indication, alarm contacts and communication over Modbus, IEC 61850 or DNP3.